Government approval
Obtain local government approval to ensure that all operations comply with local regulations.Power purchase contract
Sign the power purchase contract with the local power company to ensure the stable supply of electricity.Site Lease/Purchase
Assist customers to lease or directly purchase land for construction site.Construction of mine
Installation of power grid and security system - to ensure the safety of the site, protect the mine equipment in the site from the damage of wild animals · Repair the signed substation, replace some coils · Power engineering ·Maintenance of buildings on the site, water conservancy project, sewer project, transformer installation, ore box installationSite electrification
Power grid load survey to test whether the actual power consumption reaches the purchase level.Assistance in registering local companies (optional)
After the ownership of the mining machine and chassis is cleared, it will enter the customer company to ensure that the mining machine, chassis and other equipment are always under the customer's name.
Note: Blue represents environment-friendly hydraulic energy, while red represents traditional thermal and gas energy
Address:Michigan
Energy:Hydroelectric power generation
Price:$0.055/kWH, 3-month deposit
Total Load:30MW
Usable area:30 acres
Capacity:5000-1000 sets
Address:Wisconsin
Energy:Hydroelectric power generation
Price:$0.057-0.059/kWH, 3-month deposit
Total Load:40MW
Usable area:50 acres
Capacity:8000-15000 sets
Address:GOLD RIVER SITE, CANADA
Energy:Hydroelectric power generation
Price:$0.0498/kWH, 3-month deposit
Total Load:7MW+24MW+57MW
Usable area:50 acres
Capacity:8000-15000 sets
Land price:$13500 per month
Address:No.1 substation in Philadelphia, USA
Energy:Hybrid power supply, including natural gas
Price:$0.057-0.059/kWH, 3-month deposit
Total Load:20MW
Usable area:20 acres
Capacity:2000-5000 sets
:AddressWisconsin
:EnergyHydroelectric power generation
:Price$0.057-0.059/kWH, 3-month deposit
:Total Load40MW
:Usable area50 acres
:Capacity8000-15000 sets
Address:GOLD RIVER SITE, CANADA
Energy:Hydroelectric power generation
Price:$0.0498/kWH, 3-month deposit
Total Load:7MW+24MW+57MW
Usable area:50 acres
Capacity:8000-15000 sets
Land price:$13500 per month
:AddressNo.1 substation in Philadelphia, USA
:EnergyHybrid power supply, including natural gas
:Price$0.057-0.059/kWH, 3-month deposit
:Total Load20MW
:Usable area20 acres
:Capacity2000-5000 sets