Mine construction process

 

Friendly to international mining enterprises, Furibo obtains support from local government and quickly obtains approvals
  • Government approval

    Obtain local government approval to ensure that all operations comply with local regulations.
  • Power purchase contract

    Sign the power purchase contract with the local power company to ensure the stable supply of electricity.
  • Site Lease/Purchase

    Assist customers to lease or directly purchase land for construction site.
  • Construction of mine

    Installation of power grid and security system - to ensure the safety of the site, protect the mine equipment in the site from the damage of wild animals · Repair the signed substation, replace some coils · Power engineering
    ·Maintenance of buildings on the site, water conservancy project, sewer project, transformer installation, ore box installation
  • Site electrification

    Power grid load survey to test whether the actual power consumption reaches the purchase level.
  • Assistance in registering local companies (optional)

    After the ownership of the mining machine and chassis is cleared, it will enter the customer company to ensure that the mining machine, chassis and other equipment are always under the customer's name.

Distribution of cooperative power resources in North America

 

Provide safe and high-quality North American mine construction, trusteeship and sales management services
海外矿场托管

Note: Blue represents environment-friendly hydraulic energy, while red represents traditional thermal and gas energy

海外矿场托管

Multiple types of power stations are available

 

Freeboard Mining advocates environmental protection and economic effects,
海外矿场搭建

Address:Michigan

Energy:Hydroelectric power generation

Price:$0.055/kWH, 3-month deposit

Total Load:30MW

Usable area:30 acres

Capacity:5000-1000 sets

海外矿场搭建

Address:Wisconsin

Energy:Hydroelectric power generation

Price:$0.057-0.059/kWH, 3-month deposit

Total Load:40MW

Usable area:50 acres

Capacity:8000-15000 sets

海外矿场搭建

Address:GOLD RIVER SITE, CANADA

Energy:Hydroelectric power generation

Price:$0.0498/kWH, 3-month deposit

Total Load:7MW+24MW+57MW

Usable area:50 acres

Capacity:8000-15000 sets

Land price:$13500 per month

海外矿场搭建

Address:No.1 substation in Philadelphia, USA

Energy:Hybrid power supply, including natural gas

Price:$0.057-0.059/kWH, 3-month deposit

Total Load:20MW

Usable area:20 acres

Capacity:2000-5000 sets

:AddressWisconsin

:EnergyHydroelectric power generation

:Price$0.057-0.059/kWH, 3-month deposit

:Total Load40MW

:Usable area50 acres

:Capacity8000-15000 sets

海外矿场搭建
海外矿场搭建

Address:GOLD RIVER SITE, CANADA

Energy:Hydroelectric power generation

Price:$0.0498/kWH, 3-month deposit

Total Load:7MW+24MW+57MW

Usable area:50 acres

Capacity:8000-15000 sets

Land price:$13500 per month

:AddressNo.1 substation in Philadelphia, USA

:EnergyHybrid power supply, including natural gas

:Price$0.057-0.059/kWH, 3-month deposit

:Total Load20MW

:Usable area20 acres

:Capacity2000-5000 sets

海外矿场搭建
+86 183 1646 6248在线咨询
Online Message在线咨询

+86-15360521026 在线咨询